Hotel & Resort Landscaping — Nationwide

Your Guests Will Never See Us.
They'll Only See This.

We sequence sod, irrigation, and planting around your occupancy calendar. Work starts at 5 a.m. and disappears before your lobby fills.

Transparent Process

Sequenced Around
Your Occupancy Calendar.

A standard 34-day install. Every phase timed so your guests experience only the result — never the process.

01

Pre-Construction Survey

Day 1–3

We walk every wing with your ops director. Irrigation shutoffs, occupied-room adjacencies, and loading-dock access mapped before a single tool leaves the truck.

No disruption
02

Soil Prep & Sub-Grade

Day 4–9

Grading and soil amendment happen in the pre-dawn window, 4:30–7:00 a.m. Haul routes avoid lobby approaches. Areas return to guest-ready condition before breakfast service.

Pre-dawn only
03

Irrigation Rough-In

Day 10–16

Trenching follows wing-by-wing occupancy data you provide weekly. Pressure-tested same day. No open trenches overnight, no trip hazards near guest pathways.

Wing-by-wing
04

Hardscape & Stone Setting

Day 17–24

Entry drives, path borders, and pool-deck coping set by a dedicated masonry crew. Wet-saw cutting happens in a designated staging area, never within earshot of occupied rooms.

Staged zones
05

Planting & Sod Install

Day 25–31

Palms, shrubs, and groundcovers installed in the final pass. Sod rolls out last — guests see the finished lawn, never the bare soil. Irrigation activated and audited day 31.

Full property
06

Punch & Handoff

Day 32–34

Final walk with your GM and chief engineer. Every head adjusted, every edge trimmed. As-built irrigation map delivered in PDF and CAD for your facilities file.

Complete

Four Phases · Exact Day Counts

What Happens on Your Property.

Close-up of rich dark soil being turned and amended in a hotel landscape bed, morning light

Soil Preparation

Days 4–9

Native topsoil amended with compost at 3-inch depth. pH corrected to 6.2–6.8 for subtropical turf. Compaction testing before and after.

Irrigation sprinkler head being installed in a resort lawn bed with lush grass in background

Irrigation Rough-In

Days 10–16

Hunter MP Rotator heads on 12-inch swing joints. Smart controller with ET-based scheduling. Flow sensor on main line for leak detection.

Limestone pavers being laid on a hotel entry drive, precise alignment with rubber mallet setting

Hardscape Setting

Days 17–24

Coral limestone pavers on 4-inch compacted base. 3/16-inch joints dry-set with polymeric sand. ADA-compliant cross slopes throughout.

Mature palm trees being planted along a resort motor court with green lawn and tropical beds

Final Planting

Days 25–31

Bismarck palms, white agapanthus, and St. Augustine 'Floratam' sod. Installed in a single continuous pass for a mature, established look from day one.

Materials Specification

Named Cultivars.
Known Sources.

We don't specify "palm trees." We specify Bismarck palms from Okeechobee with 8-foot trunks. Specificity is the bid.

Turf

St. Augustine 'Floratam'

Certified Florida Sod Producers

★★★☆☆

Shade-tolerant variant for covered porte-cochère areas. 14-day establishment.

Bermudagrass 'Tifway 419'

Georgia-certified sod farms

★★★★☆

High-traffic pool decks and sport courts. Recovers in 10 days post-event.

Palms

Bismarck Palm (Bismarckia nobilis)

Okeechobee Growers, FL

★★★★★

Silver-blue canopy. Minimum 8-ft trunk for immediate presence at entry drives.

Medjool Date Palm (Phoenix dactylifera)

Desert King Nursery, AZ

★★★★★

Classic resort silhouette. Multi-trunk clusters available for mature-look installs.

Flowering Shrubs

White Agapanthus (Agapanthus africanus 'Albus')

Sun Valley Growers, CA

★★★★☆

Evergreen strap foliage. Blooms June–August, peak season alignment.

Ixora 'Maui' (Ixora coccinea)

Tropicals Plus, FL

★★★☆☆

Dense, compact form for pool-edge hedging. Continuous bloom in warm climates.

Stone & Hardscape

Coral Limestone (Florida Keystone)

American Stone, Ocala FL

—

Buff and pearl tones. Tumbled finish for slip resistance near water features.

Decomposed Granite (DG)

Southwest Aggregate, AZ

—

Stabilized with acrylic binder. Permeable — meets LEED credit SS-6.1.

Direct Sales

Get Your
Property Bid.

Fill out the form and we'll come back within one business day with a preliminary scope and timeline — before any site visit.

Case Study

The Ritz-Carlton, Sarasota

How we re-landscaped 4.2 acres around a 266-room property during a partial renovation — 0 guest complaints, 34 days.

We respond within one business day. No sales calls without your consent.